Meetings/20090612

Brief catchup

Agenda

Dave's departure
who will be Project Leader?
Next release
Stage 2 was due 2009-05-31
Review outstanding tickets
there are several that could be closed

Minutes

PL
needs to be raised at next PRB.
Release
  • release 1 - no issues related to this specifically.
  • bandpass varies with elevation or time, possibly did pre-CABB, now quite apparent (5% effect) No time-variable bandpass solutions in MIRIAD at the moment.
  • bandpass has "ripple" that seems to vary with time (timescale hours). Not seen in interferometer before, but seen at eg Mopra. Would help to have a wiki page summarising these problems.
Tickets
ticket:50, ticket:66 : refer to bits of the same issue. Should merge or close or both
ticket:46 : MW to summarise status and close if possible
ticket:78 : ATFIX may need a similar change. Or not - perhaps Tsys calibration takes it out?
Other issues
All the miriad-cabb files are locked by mirmgr, for some reason.
MW busy in coming month with NASA tracking, fixes to websched etc. We need more effort.
Mosaicing files with > 100 pointings or names > 8 characters can crash the CABB firmware.

Actions

  • MW - revisit tickets noted above
  • MW - look at making bandpass table time-dependent (1d/wk)
  • VJM - branch is behind trunk, features/fixes have been added. Move cron job to a server.
  • VJM - start drafting PRB report. Discuss with David Smith.
  • VJM - open ticket regarding comparison of whole-band vs divide&conquer imaging. ticket:84. Assign to Jamie/Emil??
  • VJM - revisit wiki:Schedule page, it needs updating to match reality.

Participants

  • Dave
  • Mark
  • Vince

Emil, Jamie overseas