Expected timing of relevant events
Event | Date | Implications
|
CABB stage 1 | 2007 Oct-Nov | Two element interferometer equipped; CABB data available
|
ATCA shutdown starts | 2008 Apr or later |
|
Commissioning complete | 2008 Jul or later | miriad Stage 1 needed for astronomy.
|
1-3 GHz receivers complete | 2009 Mar | Very wide fractional bandwidths possible
|
4-12 GHz receivers complete | 2009 Jun |
|
The above estimates were provided on 17 Aug 2007.
Stage | Description
|
1 | Basic handling of CABB data. Strong frequency dependencies ignored.
|
2 | Strong frequency dependency handled using the 'divide and conquer' approach; that is, split up the 2 GHz CABB band into a number of sub-bands for which the existing calibration tasks are adequate. Continuum images will be sums of deconvolved images from the sub-bands, limiting the image quality.
|
3 | Use of wide "continuum" bands to calibrate zoom bands.
|
4 | Data flagging on the basis of autocorrelations; single dish analysis modes. Broad bands and data volume is expected to make automatic flagging highly desirable, or essential.
|
5 | Wide bands handled explicitly: calibration and imaging tasks become frequency dependent, removing the limitations imposed by the technique used in stage 2.
|
6 | New algorithms for high-dynamic range imaging and polarimetry
|
Read ExplanationOfStages for more detail on what each stage will achieve.
Time (days) required for miriad changes for each stage.
Date | CABB/rx | miriad | M'stone
|
Aug | | Complete plan. Fork code into Trac. | 1,2,3,4,5
|
Aug-Oct | | Make atlod changes |
|
Oct 2007 | CABB stage 1 | Begin test, verify loading |
|
Nov-Mar | | Make invert changes. Test & verify to end Stage 1. | 6
|
Apr 2008 | ATCA shutdown starts | Stage 1 available for commissioning tests. |
|
Jul 2008 | Commissioning complete | Release:stage 1. Stage 2 available (shared-risk) | 8
|
Sep 2008 | | Release:stage 2 & 3 |
|
Dec 2008 | | Release:stage 4 | 9
|
Mar 2009 | 1-3 GHz receivers complete | Very wide fractional bandwidths possible |
|
Jun 2009 | 4-12 GHz receivers complete | |
|
Jun 2009 | | Release:stage 5 | 10
|