Changes between Version 4 and Version 5 of Meetings/20090612
- Timestamp:
- 06/12/09 12:56:33 (15 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
Meetings/20090612
v4 v5 23 23 * bandpass varies with elevation or time, possibly did pre-CABB, now quite apparent (5% effect) 24 24 No time-variable bandpass solutions in MIRIAD at the moment. 25 * bandpass has "ripple" that seems to vary with time (timescale hours). Not seen in interferometer before, but seen at eg Mopra. 25 * bandpass has "ripple" that seems to vary with time (timescale hours). Not seen in interferometer before, but seen at eg Mopra. Would help to have a wiki page summarising these problems. 26 27 Tickets:: 28 ticket:55, ticket:60 : refer to bits of the same issue. Should merge or close or both[[BR]] 29 ticket:46 : MW to summarise status and close if possible[[BR]] 30 ticket:78 : ATFIX may need a similar change. Or not - perhaps Tsys calibration takes it out?[[BR]] 26 31 27 32 28 Preferably write them as you go! 33 Other issues:: 34 All the miriad-cabb files are locked by mirmgr, for some reason.[[BR]] 35 MW busy in coming month with NASA tracking, fixes to websched etc. We need more effort.[[BR]] 36 Mosaicing files with > 100 pointings or names > 8 characters can crash the CABB firmware. 37 38 == Actions == 39 * MW - look at making bandpass table time-dependent (1d/wk) 40 * VJM - branch is behind trunk, features/fixes have been added. Move cron job to a server. 41 * VJM - start drafting PRB report. Discuss with David Smith. 42 * VJM - open ticket regarding comparison of whole-band vs divide&conquer imaging. Assign to Jamie/Emil? 43 * VJM - revisit wiki:Schedule page, it needs updating to match reality. 29 44 30 45 == Participants ==