Changes between Version 13 and Version 14 of Schedule


Ignore:
Timestamp:
03/07/08 13:59:24 (16 years ago)
Author:
DavidMcConnell
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • Schedule

    v13 v14  
    22
    33== Expected timing of relevant events ==
     4
     5|| '''Event''' || '''Date''' || '''Implications''' ||
     6|| CABB stage 1 || 2007 Oct-Nov || Two element interferometer equipped; CABB data available ||
     7|| Interim CABB installed || 2008 May  || 5 ant, 1 freq in parallel with old system ||
     8|| Commissioning, shared risk observing  || 2008 Jun - Sep || miriad Stage 1 needed for CABB data. ||
     9|| ATCA shutdown || 2008 October || Old system removed; full CABB installed ||
     10|| Science commissioning || 2008 December onwards || Need miriad stages 2, 3 ||
     11|| 1-3 GHz receivers complete || 2009 ? || Very wide fractional bandwidths possible ||
     12|| 4-12 GHz receivers complete || 2009 ? || ||
     13 
     14The above estimates were entered on 7 Mar 2008.
     15
     16Previous timetable.
    417
    518|| '''Event''' || '''Date''' || '''Implications''' ||