Version 9 (modified by 15 years ago) (diff) | ,
---|
Meetings/20090612
Brief catchup
Agenda
- Dave's departure
- who will be Project Leader?
- Next release
- Stage 2 was due 2009-05-31
- Review outstanding tickets
- there are several that could be closed
Minutes
- PL
- needs to be raised at next PRB.
- Release
-
- release 1 - no issues related to this specifically.
- bandpass varies with elevation or time, possibly did pre-CABB, now quite apparent (5% effect) No time-variable bandpass solutions in MIRIAD at the moment.
- bandpass has "ripple" that seems to vary with time (timescale hours). Not seen in interferometer before, but seen at eg Mopra. Would help to have a wiki page summarising these problems.
- Tickets
-
ticket:50, ticket:66 : refer to bits of the same issue. Should merge or close or both
ticket:46 : MW to summarise status and close if possible
ticket:78 : ATFIX may need a similar change. Or not - perhaps Tsys calibration takes it out?
- Other issues
-
All the miriad-cabb files are locked by mirmgr, for some reason.
MW busy in coming month with NASA tracking, fixes to websched etc. We need more effort.
Mosaicing files with > 100 pointings or names > 8 characters can crash the CABB firmware.
Actions
- MW -
revisit tickets noted above - MW -
look at making bandpass table time-dependent (1d/wk) - VJM -
branch is behind trunk, features/fixes have been added. Move cron job to a server. - VJM -
start drafting PRB report. Discuss with David Smith. - VJM -
open ticket regarding comparison of whole-band vs divide&conquer imaging.ticket:84. Assign to Jamie/Emil?? - VJM - revisit wiki:Schedule page, it needs updating to match reality.
Participants
- Dave
- Mark
- Vince
Emil, Jamie overseas