Timeline
09/21/07:
- 17:19 WikiStart edited by
- add news re milestone numbering (diff)
- 17:17 Changes/atlod edited by
- start fixing milestone numbering (diff)
- 17:09 Changes/uvflag edited by
- (diff)
- 17:09 Ticket #25 (Use seeing monitor data for automatic flagging) created by
- The seeing monitor gives a useful indication of phase stability at all …
- 17:07 Changes/uvflag edited by
- (diff)
- 17:07 Ticket #24 (UVFLAG can flag using autocorrelation data) created by
- Add selection and baseline removal options to uvflag to facilitate …
- 17:03 Changes/atlod edited by
- fix ticket numbers, sigh (diff)
- 17:03 Changes/atlod edited by
- link to tickets for sampler stats item (diff)
- 17:01 Ticket #23 (Do not try to autoflag CABB data based on sampler statistics) created by
- Sampler statistics will not be present in CABB data, so ATLOD should …
- 16:59 Ticket #22 (Disable "samcorr" mode for CABB data) created by
- Sampler statistics will not be present in CABB data, so "samcorr" mode …
- 16:53 Ticket #21 (ATLOD can handle known external RFI) created by
- There will definitely be some frequencies in the CABB bandpass that …
- 16:50 Schedule edited by
- (diff)
- 16:49 Schedule edited by
- (diff)
- 16:47 ExplanationOfStages edited by
- (diff)
- 16:45 Ticket #20 (ATLOD can handle known CABB birdies) created by
- There will probably be some self-generated interference from CABB, as …
- 16:41 Ticket #19 (ATLOD can read in a simulated datafile containing multiple correlator modes) created by
- This is the corollary to 17. Atlod can do this already - a …
- 16:38 Ticket #18 (ATLOD can read any one IF from a CABB data file) created by
- This is a placeholder ticket; this functionality should already be there.
- 16:36 ExplanationOfStages edited by
- (diff)
- 16:27 Ticket #17 (ATLOD can read in a simulated datafile containing one correlator mode) created by
- Warwick will be writing out RPFITS data files in the Marsfield labs …
- 16:20 WikiStart edited by
- move costcode (diff)
- 16:18 WikiStart edited by
- change url of issue tracking shortcuts (diff)
- 16:15 WikiStart edited by
- (diff)
- 16:13 WikiStart edited by
- add Issue Tracking subheading; rearrange introductory text (diff)
- 14:29 Meetings/20070927 edited by
- (diff)
- 14:28 Meetings/20070927 edited by
- (diff)
- 14:28 Meetings/20070927 edited by
- (diff)
- 13:20 Ticket #3 (set up milestones) closed by
- fixed
- 13:19 Ticket #2 (set up project components) closed by
- fixed
- 13:18 Ticket #15 (plan: budget) closed by
- fixed
- 13:17 Ticket #14 (plan: measures of success) closed by
- fixed
- 13:17 Ticket #13 (plan: scope) closed by
- fixed
- 13:17 Ticket #16 (plan: look at other projects) closed by
- fixed
- 13:17 Ticket #12 (plan: set milestones) closed by
- fixed
- 13:17 Ticket #11 (plan: budget) closed by
- fixed
- 13:16 Ticket #10 (plan: measures of success) closed by
- fixed
- 13:16 Ticket #9 (plan: scoping) closed by
- fixed
- 13:16 Ticket #8 (plan: technical details) closed by
- fixed
- 13:16 Ticket #7 (write requirements document) closed by
- fixed
- 13:15 Ticket #16 (plan: look at other projects) created by
- Compare the timeline of CABB and our work so we can work out any …
- 13:13 Ticket #15 (plan: budget) created by
- Redo budget based on descoped plan, and more realistic time people …
- 13:12 Ticket #14 (plan: measures of success) created by
- Revise measures of success to match new plan
- 13:11 Ticket #13 (plan: scope) created by
- reduce the scope of work - the last stage was not well defined and we …
- 13:02 Ticket #12 (plan: set milestones) created by
- Once we know what we have to do, set up the sequence of events and …
- 12:54 Ticket #11 (plan: budget) created by
- After the plan is laid out, work out the costs - for us it's mainly …
- 12:53 Ticket #10 (plan: measures of success) created by
- Write out some succinct measures by which we will know we're "done". …
- 12:52 Ticket #9 (plan: scoping) created by
- Write up the section that describes how much of the requirements we …
- 12:49 Ticket #8 (plan: technical details) created by
- Summarise the requirement document in a form that gives the PRB some …
- 12:46 Ticket #7 (write requirements document) created by
- Consider how CABB is going to change the way data comes off the …
- 12:42 Ticket #6 (Branch code) created by
- Create a branch for the miriad4cabb code to go into.
- 12:41 Ticket #5 (check updating from RCS) created by
- Test that it is possible to pull updates from the RCS version of …
- 12:39 Ticket #4 (import miriad code) created by
- Suck the code out of RCS and plop it into subversion. cvs2svn is our …
- 12:37 Ticket #3 (set up milestones) created by
- Insert the milestones as shown in the project plan. For each milestone …
- 12:35 Ticket #2 (set up project components) created by
- Define what the code elements of the project are and create a …
- 11:38 Ticket #1 (install tracker) closed by
- fixed
- 11:37 Ticket #1 (install tracker) created by
- Set up this tracker
09/20/07:
09/19/07:
09/12/07:
09/11/07:
09/10/07:
- 16:09 ExplanationOfStages edited by
- flesh out part 6. remove "draft" status (diff)
- 15:53 ExplanationOfStages edited by
- clarify the autocorrelations stuff (diff)
- 15:39 SyscalDataFormats created by
- 15:20 Changes/atlod edited by
- (diff)
- 12:29 Changes/atlod edited by
- (diff)
- 10:18 Changes/invert edited by
- (diff)
- 10:18 Changes/invert edited by
- scalable beam requirement (diff)
- 10:07 Changes/polarization edited by
- off-axis leakages (diff)
- 09:56 Changes/polarization edited by
- tweak the appearance (polzn tasks) (diff)
- 09:43 CurrentBandwidths edited by
- fix 12 & 7 mm entries (diff)
09/06/07:
- 13:26 Meetings/20070927 created by
- 13:24 WikiStart edited by
- (diff)
- 13:23 Meetings edited by
- (diff)
- 13:22 Meetings edited by
- (diff)
09/05/07:
- 17:51 Meetings/20070905 created by
- 17:43 Meetings edited by
- (diff)
- 17:40 Changes/polarization edited by
- (diff)
- 17:39 Changes/polarization edited by
- (diff)
- 17:38 Changes/polarization edited by
- (diff)
- 17:37 Changes/polarization edited by
- (diff)
- 17:37 Changes/polarization edited by
- tweak to "other issues" (diff)
- 14:20 ExplanationOfStages edited by
- (diff)
- 12:06 Schedule edited by
- (diff)
- 12:05 CurrentBandwidths edited by
- (diff)
- 12:03 CurrentBandwidths created by
- 12:00 ExplanationOfStages created by
- initial draft, dumping text from old plan document.
- 11:50 Schedule edited by
- (diff)
- 11:49 Schedule edited by
- (diff)
- 11:41 WikiStart edited by
- (diff)
- 11:12 Schedule edited by
- (diff)
- 11:09 Schedule edited by
- (diff)
- 11:08 Schedule edited by
- (diff)
09/04/07:
- 15:49 Notes/mmNotes edited by
- add email re 7mm opacity (diff)
- 15:36 Notes/mmNotes edited by
- (diff)
- 11:47 MoreInformation edited by
- (diff)
- 11:46 Notes/mmNotes edited by
- (diff)
- 11:45 Notes/mmNotes edited by
- (diff)
- 11:45 Notes/mmNotes created by
- initial page, note some 7mm points.
- 11:38 Notes edited by
- add mmNotes (diff)
- 11:37 Notes edited by
- (diff)